![]() Immediately following pouring begin to spread out the mixture by lightly trowelling the surface.Begin to pour out the mixed Micro Level 5000 on to the primed surface and work to the required thickness using long handled gauge rakes, smoothing paddles and trowels.(Please refer our downloadable PDS for more detailed instructions on Mixing)įor best results coverage of the subfloor should be completed within as short a timeframe and with as few interruptions to the process as possible. Ensure there are no lumps and the consistency of the mixture smooth and even.Avoid excessive mixing as this can trap air in the mixture, causing “pin-holing”(craters and spaces left in and on the concrete surface by escaping air bubbles) which can compromise overall concrete strength and lead to possible cracking.Allow to slake (rest) for 1 minute before mixing again briefly.Mix thoroughly on low speed (less than 300 rpm) for 2-3 minutes.Do not exceed the stated amount of water per bag as this will reduce the overall strength of the concrete. Follow the advised water to powder ratio: 4.8- 5.3 US.Open sacks carefully to avoid spillage and add the dry powder to water in the mixing drum or bucket.Do not exceed the recommended amount of water per bag ratio as this will reduce the strength of the concrete. Micro Level 5000 should be mixed according to the recommended water to powder ratio. (Please refer to our downloadable PDS for more detailed instructions on Surface Preparation) ![]() ![]() Micro Milling recommends using TEC® Multi-purpose Surface Primer
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |